Anyone know a good tutorial explaining the difference between PERT and CPM scheduling techniques? These are formal techniques for developing schedules for software engineering projects. Unfortunately my textbook doesn't explain these very well. :(
PERT CPM
it is event oriented it is activity oriented.
it is based on 3 time estimates: it is deterministic.time
optimistic ,most likely and pessimistic estimates are based on past
data.
time is not realted to costs. time is related to costs.
Anyone know a good tutorial explaining the difference between PERT and CPM scheduling techniques? These are formal techniques for developing schedules for software engineering projects. Unfortunately my textbook doesn't explain these very well. :(
http://studentweb.tulane.edu/~mtruill/dev-pert.html
http://www.netmba.com/operations/project/pert/
http://www.envisionsoftware.com/articles/Pert_Chart.html
best regards
I do believe we have a new thread digging record. This thread is 6 1/2 years old. :thumbsup:
I do believe we have a new thread digging record. This thread is 6 1/2 years old. :thumbsup:
I'm good, my old record was smaller, :) For swathipanchalam is probably first post but I used to look to see how old is the thread, :)